OOO LUKOIL-Volgogradneftepererabotka
Scope of work
Reconstruction of the delayed coking unit type 21-10 / 7 of the heavy oil residues processing package.
Process equipment control board.
Design, assembly, commissioning.
Year
2020
Cost of work performed
more than 10 000 000 rub